First day in shop
turned over to remove bottom
removing bottom planks
planks removed from bottom
removing side planks
old frame conditions
transom planks removed
replacing side frames
removing side frames
new frames being installed
installing new bottom frames
repaired stem rebuilding last bottom frame
removing chines to be rebuilt
coating frames with epoxy
installing new keel
new keel in place, old chines removed ready to nstall new chines
cleaning epoxy after installing new chines
new chines clamped in place
Port side with all new frames keel and chine faired and ready for bottom skin
STB side with new frames keel and chine faired and ready for bottom skin
First layer of bottm skin fit.
First layer of bottom skin fit.
First layer of plywood glued down with West System epoxy.
View from transom of first layer glued down.
Applying glue to attach second layer to the first.
Second layer of plywood glued in place.
Starboard second layer glued in place.
Ready to fit keel cap.